Star Valley Morocco

About Star Valley Drilling Fleet:

 

  • No recordable or lost time incidents (Zero TRIF)
  • Entire fleet repair time is less than 1%
  • International repair time 0.63%
  • Cut Drill times by 60%
  • Reduce Rig up time by 85%
  • Using highly experienced Canadian rig crews
  • Modern Advanced Drilling Rigs

 

 

3 hour rig up timelapse – 1000hp Drilling Rig

Star Valley Rig Single Series 1000HP AC/VFD PLC Controlled Range III Super Single:

FAST MOVING

  • Range III Single 3000m+ 133,000kDaN (300,000 lbs hook load)
  • Integrated FDS 150 Top Drive (133,000kDaN or 300,000 lbs)
  • CanRig TM-120 Iron Roughneck
  • Fully Automated Hydraulic RIII Pipe Handling Skate Catwalk
  • Mud Pump(s): (1x) 1300hp (AC w/ 1150hp traction motor)
  • Mud Pump(s): (1x) 1000hp (1050hp mechanical motor)
  • BOP hydraulic handling system
  • Hydraulic subs with leveling system
  • Independently powered HPU capable of operating winches, raising mast and doghouse control center without AC drive system on line
  • 5000 psi Circulation system
  • (2) Derrek Shakers
  • AC/VFD Electric Fully Automated dog house driver (Airconditioned)
  • 1000hp AC Drawworks
  • Fast Moving Rig (capable of 6-8 hour moves)
  • Computer controlled drilling system – Integrated Auto Digger
  • No cranes required (see move video attached)