Star Valley Morocco
About Star Valley Drilling Fleet:
- No recordable or lost time incidents (Zero TRIF)
- Entire fleet repair time is less than 1%
- International repair time 0.63%
- Cut Drill times by 60%
- Reduce Rig up time by 85%
- Using highly experienced Canadian rig crews
- Modern Advanced Drilling Rigs
3 hour rig up timelapse – 1000hp Drilling Rig
Star Valley Rig Single Series 1000HP AC/VFD PLC Controlled Range III Super Single:
FAST MOVING
- Range III Single 3000m+ 133,000kDaN (300,000 lbs hook load)
- Integrated FDS 150 Top Drive (133,000kDaN or 300,000 lbs)
- CanRig TM-120 Iron Roughneck
- Fully Automated Hydraulic RIII Pipe Handling Skate Catwalk
- Mud Pump(s): (1x) 1300hp (AC w/ 1150hp traction motor)
- Mud Pump(s): (1x) 1000hp (1050hp mechanical motor)
- BOP hydraulic handling system
- Hydraulic subs with leveling system
- Independently powered HPU capable of operating winches, raising mast and doghouse control center without AC drive system on line
- 5000 psi Circulation system
- (2) Derrek Shakers
- AC/VFD Electric Fully Automated dog house driver (Airconditioned)
- 1000hp AC Drawworks
- Fast Moving Rig (capable of 6-8 hour moves)
- Computer controlled drilling system – Integrated Auto Digger
- No cranes required (see move video attached)